Academycase-studyReplacing four SaaS subscriptions with five Conduction apps
Replacing four SaaS subscriptions with five Conduction apps
How a Frisian municipality moved from four hosted services to a single Nextcloud workspace, in eleven weeks.
A short summary of the migration. Placeholder while we draft the full version with the customer's permission.
The starting point
Four SaaS subscriptions, three vendor contracts, and a fourth on the way. The IT lead estimated 9 percent of operating budget went to per-seat licensing on tools that did not talk to each other.
What we did
Stood up Nextcloud on the existing on-prem hardware, installed OpenRegister, OpenCatalogi, OpenConnector, DocuDesk, and MyDash from the app store. Migrated the data with two OpenConnector flows. Trained the team in two half-day sessions.
The numbers
- Eleven weeks from kickoff to cutover
- Five apps replacing four SaaS subscriptions
- One vendor contract instead of three
- Annual savings: roughly two FTE-months of admin time, plus the licence delta
